Altium

Design Rule Verification Report

Date: 5/14/2026
Time: 6:06:06 PM
Elapsed Time: 00:00:01
Filename: C:\Users\jqyli\AppData\Local\TempReleases\Snapshot\1\May10_PCBDoc.PcbDoc
Warnings: 0
Rule Violations: 0
Waived Violations: 20

Summary

Warnings Count
Total 0

Rule Violations Count
Clearance Constraint (Gap=5mil) (All),(All) 0
Clearance Constraint (Gap=10mil) (InPolygon),(All) 0
Short-Circuit Constraint (Allowed=No) (All),(All) 0
Un-Routed Net Constraint ( (All) ) 0
Modified Polygon (Allow modified: No), (Allow shelved: No) 0
Width Constraint (Min=10mil) (Max=30mil) (Preferred=20mil) (InNetClass('3V3')) 0
Width Constraint (Min=10mil) (Max=30mil) (Preferred=20mil) (InNet('GND')) 0
Width Constraint (Min=20mil) (Max=40mil) (Preferred=30mil) (InNetClass('Power')) 0
Width Constraint (Min=6mil) (Max=400mil) (Preferred=8mil) (All) 0
Routing Topology Rule(Topology=Shortest) (All) 0
Power Plane Connect Rule(Relief Connect )(Expansion=4mil) (Conductor Width=6mil) (Air Gap=6mil) (Entries=4) (All) 0
Minimum Annular Ring (Minimum=4mil) (All) 0
Hole Size Constraint (Min=10mil) (Max=265mil) (All) 0
Hole To Hole Clearance (Gap=10mil) (All),(All) 0
Minimum Solder Mask Sliver (Gap=0mil) (All),(All) 0
Silk To Solder Mask (Clearance=5mil) (IsPad),(All) 0
Silk to Silk (Clearance=0mil) (All),(All) 0
Net Antennae (Tolerance=0mil) (All) 0
Board Clearance Constraint (Gap=0mil) (All) 0
Height Constraint (Min=0mil) (Max=1000mil) (Prefered=500mil) (All) 0
Total 0

Waived Violations Count
Un-Routed Net Constraint ( (All) ) 20
Total 20

Rule Violations

Waived Violations

Un-Routed Net Constraint ( (All) )
Un-Routed Net Constraint: Net GND Between Pad J11-4(-1037mil,-467.441mil) on Top And Pad J11-2(-1037mil,-467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J11-5(-1312mil,-467.441mil) on Top And Pad J11-3(-1312mil,-467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J1-2(-1865.441mil,137.5mil) on Top And Pad J1-4(-1865.441mil,137.5mil) on Bottom
Waived by Jessica Li at 5/11/2026 1:48:52 AM
although they appear unrouted as of now after soldering connector on it, the two grounds will become routed
Un-Routed Net Constraint: Net GND Between Pad J12-4(-1312mil,467.441mil) on Top And Pad J12-2(-1312mil,467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J12-5(-1037mil,467.441mil) on Top And Pad J12-3(-1037mil,467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J1-3(-1865.441mil,-137.5mil) on Top And Pad J1-5(-1865.441mil,-137.5mil) on Bottom
Waived by Jessica Li at 5/11/2026 1:48:52 AM
although they appear unrouted as of now after soldering connector on it, the two grounds will become routed
Un-Routed Net Constraint: Net GND Between Pad J21-4(-254mil,-467.441mil) on Top And Pad J21-2(-254mil,-467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J21-5(-529mil,-467.441mil) on Top And Pad J21-3(-529mil,-467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J2-2(1865.441mil,-137.5mil) on Top And Pad J2-4(1865.441mil,-137.5mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J22-4(-529mil,467.441mil) on Top And Pad J22-2(-529mil,467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J22-5(-254mil,467.441mil) on Top And Pad J22-3(-254mil,467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J2-3(1865.441mil,137.5mil) on Top And Pad J2-5(1865.441mil,137.5mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J31-4(529mil,-467.441mil) on Top And Pad J31-2(529mil,-467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J31-5(254mil,-467.441mil) on Top And Pad J31-3(254mil,-467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J32-4(254mil,467.441mil) on Top And Pad J32-2(254mil,467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J32-5(529mil,467.441mil) on Top And Pad J32-3(529mil,467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J41-4(1312mil,-467.441mil) on Top And Pad J41-2(1312mil,-467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J41-5(1037mil,-467.441mil) on Top And Pad J41-3(1037mil,-467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J42-4(1037mil,467.441mil) on Top And Pad J42-2(1037mil,467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.
Un-Routed Net Constraint: Net GND Between Pad J42-5(1312mil,467.441mil) on Top And Pad J42-3(1312mil,467.441mil) on Bottom
Waived by Jessica Li at 5/10/2026 1:46:07 AM
Although the grounds of a SMA connector are not routed togther, they will be electrically connected through the SMA.

Back to top